RF Simulation and Test of the New Buncher at INFN-LNS  

RF Simulation and Test of the New Buncher at INFN-LNS

在线阅读下载全文

作  者:LI Peng-zhan Antonio Caruso Alberto Longhitano JI Bin 

机构地区:[1]Division of the BRIF Project [2]Istituto Nazionale di Fisica Nucleare-Laborator i Nazionali del Sud (INFN-LNS)

出  处:《Annual Report of China Institute of Atomic Energy》2013年第1期21-22,共2页中国原子能科学研究院年报(英文版)

摘  要:The present buncher of INFN-LNS K800 Superconducting Cyclotron is installed inside the yoke of the cyclotron,0.5 m below the medium plane.The new buncher is designed to replace the present buncher for the convenience of maintenance and commissioning.The new buncher is featured with the three-electrode structure.The bunching gap is 5 mm and the length of the central electrode is 83.5 mm.

关 键 词:maintenance installed featured replace CONVENIENCE matching CAPACITANCE length ROTATION WAVEFORM 

分 类 号:TL542[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象