检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江华电乌溪江水力发电厂,浙江省衢州市324000 [2]浙江华光潭水力发电有限公司,浙江省临安市311322
出 处:《水电自动化与大坝监测》2013年第5期65-67,74,共4页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:高精度全站仪用于变形监测已日益普遍,同时对其配套的目标棱镜也提出了更高的要求,要保证全站仪在变形监测中达到预期目标,必须分析检验目标棱镜存在的误差及其对观测值的影响。通过对现场观测方法采取一定的措施消除或削弱其影响,或采用一种新型、高效、可靠、简便、经济的全站仪目标配套设施,高效地提高变形监测精度和监测资料的可靠性。工程实践证明,全站仪目标棱镜偏心差明显降低了变形监测的精度和可靠性,完全可以采取有效措施加以解决。Precise Total station is used for deformation monitoring increasingly common and it requests the target prism has higher standards.To ensure the whole Total station reaches the expectation while the deformation monitoring,it is necessary to analyze the target prism error and its influence on the result.It can improve the monitoring precision and the datum reliability through some certain measure at the site to weaken the influence or adopting a kind of new target kit of Total station which is efficient,credible,simple,economy.The engineering practice proves that the precision and reliability severely reduced by the centeringerror of target prism in total station obviously can be eliminated effective.
分 类 号:TH7[机械工程—仪器科学与技术] O43[机械工程—精密仪器及机械]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.109.97