相邻超大深基坑同步开挖的设计与实践  被引量:21

Design and application of synchronous construction of two neighboring deep excavations

在线阅读下载全文

作  者:陈萍[1] 王卫东[1] 丁建峰 

机构地区:[1]华东建筑设计研究院有限公司地基基础与地下工程设计研究所,上海200002 [2]上海外滩国际金融服务中心置业有限公司,上海200002

出  处:《岩土工程学报》2013年第S2期555-558,共4页Chinese Journal of Geotechnical Engineering

基  金:上海市青年科技启明星计划B(11QB1400400)

摘  要:以上海外滩国际金融服务中心深基坑工程为背景,针对相邻两个深基坑同步开挖这一关键问题提出相应的技术措施。实践结果表明,本工程中相邻两个深基坑同步开挖实施达到了安全可控的目标,对周边环境的影响也在安全范围内,可为软土地区同类工程提供参考。Shanghai Bund International Financial Center Project involves the excavation of two neighboring deep excavations. The safety and deformation control are the key issue that should be carefully considered in the synchronous construction of the two excavations. Some technical measures are adopted to reduce the interaction of the construction of the two deep excavations. The monitored data show that deformation of diaphragm walls, soils and the adjacent facilities is under control. The successful construction of the project can be used as a reference for similar deep excavations in soft soils.

关 键 词:地下连续墙 相邻深基坑 同步开挖 

分 类 号:TU473.2[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象