某地铁上盖工程结构体系比选  被引量:2

Study and comparison of structural system of the building over subway station

在线阅读下载全文

作  者:包联进[1] 黄永强[1] 高双喜[1] 周建龙[1] 江晓峰[1] 

机构地区:[1]华东建筑设计研究院有限公司,上海200002

出  处:《建筑结构》2013年第S1期119-122,共4页Building Structure

摘  要:某地铁上盖结构,地下1层,地上7层,总建筑面积约11.1万m2,建筑高度43m。建筑平面呈圆环形,地铁区间、车站和机房从其中心穿过,地下室被地铁线路一分为二。上部结构的最大转换跨度为117m。转换区域存在的弯矩、扭矩与剪力使得结构的受力特点极为复杂。主要介绍了两种转换方案的研究与对比。The 43m-high commercial center in circle plan covers 111 000 m2,with seven stories and one story basement. The built subway line lies across the building which separates the basement into two parts. The upper stories over the subway station has to be transferred and the maximum transfer distance is about 117 meters. Considering the complicated force characteristics in the transition region under combined bending moment,torque and shear due to transfering,two structural system for this building has been studied and compared.

关 键 词:地铁上盖 环形建筑 大跨度转换 框架支撑筒 拱结构 

分 类 号:TU318[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象