张拉索膜结构预应力施工模拟分析  

Construction process simulation analysis on tension membrane structures

在线阅读下载全文

作  者:乔磊[1] 赵乐之[2] 乔宁 李波[4] 

机构地区:[1]城市建设研究院,北京100120 [2]北京市市政工程设计研究总院,北京100082 [3]烟建集团第六建筑安装分公司,烟台264003 [4]中国恩菲工程技术有限公司,北京100038

出  处:《建筑结构》2013年第S1期1027-1030,共4页Building Structure

摘  要:为了克服目前张拉索膜结构施工过程中通常采用的分批张拉和反复调整的问题,采用主应力-主应变准则来判别膜材受力状态并利用修改本构矩阵的方法处理褶皱或松弛单元,提出先逆向放松后正向张拉的两阶段施工模拟方法,获得一次张拉成形的施工张拉值。通过对威海体育场看台挑篷索膜结构施工过程的数值模拟,结果表明,此种方法能够获得使结构整体一次张拉成形的施工张拉值,对大型张拉索膜结构具有较大的实用性。In order to overcome active tensioning in batches and adjusting repeatedly adopted in practical construction process of tensioned membrane structures, two stages simulation strategy which combined releasing reversely and tensioning positively is proposed. Principal stress and strain criterion is used to judge stress state. Modified constitutive matrix is used for dealing with wrinkling or slackness elements. Numerical simulation analysis on construction process of cable-membrane structure of stadium canopy in Weihai is carried out,the results show that the method can get construction tensioning value of integral one-time tension and has great advantages for large-span tension membrane structures.

关 键 词:张拉索膜结构 预应力施工 力学模拟分析 分批张拉 褶皱 

分 类 号:TU399[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象