检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王肇东[1]
机构地区:[1]中国煤炭科工集团,北京100013
出 处:《煤炭工程》2013年第S1期98-99,共2页Coal Engineering
基 金:国家科技支撑计划课题(2012BAB3B00;2012BAB3B02);中国煤炭科工集团科技创新基金(2012M05)
摘 要:通过对石窑店煤矿215205综采工作面超前煤体及区段煤柱应力进行实测和理论分析,掌握了该条件下煤体应力分布特征。结果表明:该工作面超前支承压力峰值位于煤壁前方3~4m,影响范围约10.25~13.5m,工作面所留设20m区段煤柱可以满足支护要求。所得成果对类似地质条件下工作面超前支护范围和煤柱合理留设有指导作用。With the site measurements and theoretical analysis conducted on the stresses of the advance coal seam and sectional coal pillars in No.215205 fully mechanized coal mining face of Shiyaodian Mine,the stress distribution features of the coal seam under the conditions were understood.The results showed that the advance support pressure peak of the coal mining face was in front of the coal wall with a distance of 3~4m,the influence scope was about 10.25~13.5m and the sectional coal pillar with 20m set in the coal mining face could meet the support requirements.The achievements obtained would have the guidance role to the advance support scope and the coal pillar rationally set of the coal mining face under the similar geological conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66