出 处:《防灾减灾工程学报》2013年第S1期31-37,共7页Journal of Disaster Prevention and Mitigation Engineering
基 金:国家自然科学基金项目(50678059);河北省教育厅科研计划项目(2004435)资助
摘 要:以假定地铁站为工程背景,采用目前施工地铁站较为普遍的逆作法与洞桩法分别进行施工。为对比分析两种工法施工地铁站引起的位移,应用数值分析方法对逆作法和洞桩法在分跨开挖方式下修建地铁站的施工过程进行模拟。经计算有限元模型,得出两种工法在分跨开挖方式下施工地铁站引起的地表沉降、侧桩水平位移、底板隆起的对比图。通过分析位移对比图,得出洞桩法施工地铁站在位移控制方面优于逆作法的结论,从而深化对逆作法与洞桩法施工地铁站作用机理的认识,以期为类似工程提供参考。Taking a typical subway station as engineering background,the two common construction methods,top-down method and hole-pile method,are adopted to simulate the excavation of the subway station.In order to analysis the displacement caused by top-down method and holepile method,the numerical analysis technique is adopted to simulate the construction process of the subway station excavated in span with these two methods separately.Comparison charts of surface settlement,lateral horizontal displacement of piles and floor uplift are obtained by computation.The simulation result shows that the hole-pile method is superior to the top-down method in controlling displacement.The research can help deeply understand the mechanism of top-down method and hole-pile methods,and provide valuable reference for similar projects.
分 类 号:U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.251.87