逆作法与洞桩法分跨开挖施工地铁站位移对比分析  被引量:1

Comparative Analysis on Displacement of Subway Station Excavated in Span with Top-down and Hole-pile Methods

在线阅读下载全文

作  者:史庆涛 胡永利[1] 

机构地区:[1]中铁十四局集团有限公司,济南250014

出  处:《防灾减灾工程学报》2013年第S1期31-37,共7页Journal of Disaster Prevention and Mitigation Engineering

基  金:国家自然科学基金项目(50678059);河北省教育厅科研计划项目(2004435)资助

摘  要:以假定地铁站为工程背景,采用目前施工地铁站较为普遍的逆作法与洞桩法分别进行施工。为对比分析两种工法施工地铁站引起的位移,应用数值分析方法对逆作法和洞桩法在分跨开挖方式下修建地铁站的施工过程进行模拟。经计算有限元模型,得出两种工法在分跨开挖方式下施工地铁站引起的地表沉降、侧桩水平位移、底板隆起的对比图。通过分析位移对比图,得出洞桩法施工地铁站在位移控制方面优于逆作法的结论,从而深化对逆作法与洞桩法施工地铁站作用机理的认识,以期为类似工程提供参考。Taking a typical subway station as engineering background,the two common construction methods,top-down method and hole-pile method,are adopted to simulate the excavation of the subway station.In order to analysis the displacement caused by top-down method and holepile method,the numerical analysis technique is adopted to simulate the construction process of the subway station excavated in span with these two methods separately.Comparison charts of surface settlement,lateral horizontal displacement of piles and floor uplift are obtained by computation.The simulation result shows that the hole-pile method is superior to the top-down method in controlling displacement.The research can help deeply understand the mechanism of top-down method and hole-pile methods,and provide valuable reference for similar projects.

关 键 词:地铁站 逆作法 洞桩法 位移对比 有限元模型 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象