PDCA循环在建设项目成本管理中的应用  被引量:10

The Application of PDCA Cycle in the Construction Project Cost Management

在线阅读下载全文

作  者:万元林[1] 张赛[1] 

机构地区:[1]中国矿业大学(北京)力学与建筑工程学院,北京100083

出  处:《施工技术》2013年第S1期340-342,共3页Construction Technology

摘  要:建设项目工程管理过程中最关键的3个部分是成本控制、进度控制、质量控制,而业主方在三大控制中最关心的是成本控制。PDCA循环是美国质量管理学家戴明博士发明的全面质量管理方法,因其是不断循环,不断上升的,又称其为戴明环。通过采用PDCA循环模式对成本加以管控,在保证不影响工期和质量的前提下,以最优的成本方案完成建设项目。The three most critical parts in the construction project management process are the cost control,schedule control and quality control.And the cost control is the part owners most concerned about.PDCA cycle is a total quality management method invented by Dr.W.Edwards.Deming,a quality management expert,USA,and it is also known as the Deming cycle because of its continuous rising and circularity.The cost should be controlled by using the PDCA cycle mode.Thereby,we can complete the construction project with an optimum cost program on the premise that be guaranteed not to affect the duration and quality.

关 键 词:建设项目 工程管理 成本管理 PDCA循环 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象