复杂地质条件下大采高综采面支架倒架原因及对策  被引量:7

Study on Support Tilt in Long-wall with Large Mining Height under Complicated Geological Conditions and Controlling Strategy

在线阅读下载全文

作  者:张丰杰[1] 张占涛[2] 

机构地区:[1]晋煤集团长治仙泉煤业有限公司,山西长治046000 [2]天地科技股份有限公司,北京100013

出  处:《煤炭技术》2015年第3期232-234,共3页Coal Technology

摘  要:针对仙泉煤业4304大采高综采工作面进入泮沟南向斜构造影响区后支架出现不同程度的倒架现象,采用理论分析和工程类比的方法,提出了大采高综采面过构造影响区时防治倒架的"掏槽掘进预先支护顶板"法,现场应用效果良好。"掏槽掘进预先支护顶板"法在4304大采高综采工作面支架防倒中的成功应用,对指导类似条件大采高综采工作面的生产具有重要意义。For the support tilt phenomenon in varying degrees when height long wall with large mining coal working face No 4304 was in Pangounan syncline area, the theoretical and engineering analogy methods were used. And the method of the cutting excavating and supporting the roof in advance was proposed, it is proofed fine in field application. The successful application of the method in anti-tilt of supports in height long wall with large mining coal working face No 4304 had great significance for guiding similar conditions.

关 键 词:大采高综采 倒架原因 防治对策 掏槽掘进 

分 类 号:TD355.4[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象