检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东科技大学矿业与安全工程学院,山东青岛266590
出 处:《煤炭技术》2015年第6期33-35,共3页Coal Technology
摘 要:以鹿洼煤矿2307(2)预采顶分层放顶煤工作面为工程背景,通过对工作面顶板的破断过程进行现场观测、理论研究、数值模拟,得到工作面顶板运动规律及矿压显现特点。对顶煤的冒放性进行了较为直观的分析评价,确定了合理的放煤步距,目的在于提高该工作面煤炭回收率,形成此类工作面高产高效技术体系,为其他相似地质、生产条件矿井提高煤炭回收率起到推广和借鉴作用。With Luwa coal mine 2307(2)pre-mining top slice caving face as the engineering background,through the field observation,theoretical research and numerical simulation on the process of roof fracture, conclusions could be got that the movement rules of the roof and characteristics of strata behaviors, and then we made a intuitive analysis and evaluation on the top-coal caving ability,and determined a reasonable caving coal interval. The objective of this research is to improve the coal recovery rate, and form such a high yield and efficient technology system as to make a reference for the other mine with similar geological and production conditions in promoting the recovery rate.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30