作 者:汪海萍[1,2] 宋卫东[1,2] 张兴才[3] 周家祥[3]
机构地区:[1]北京科技大学金属矿山高效开采与安全教育部重点实验室,北京100083 [2]北京科技大学土木与环境工程学院,北京100083 [3]武汉钢铁集团矿业有限责任公司大冶铁矿,湖北黄石市435006
出 处:《矿业研究与开发》2015年第5期26-29,共4页Mining Research and Development
基 金:国家自然科学基金项目(51374033);博士点基金项目(20120006110022)
摘 要:为保护矿山公园和露天边坡,大冶铁矿东采-180m阶段采用分段凿岩阶段空场嗣后胶结充填法回采,其计算充填倍线为5.24,满足自流输送条件,故采用全尾砂自流胶结充填工艺。目前该阶段首采矿块310号矿房开采顺利,其开采回采率达92.0%,贫化率为9.6%,回采技术指标明显优于-120m阶段的无底柱分段崩落法。In order to protect the mine park and open-pit slope,the sublevel drilling and stage mining method with cemented filling was used in east-180 mstage of Daye Iron Mine.And the cemented filling process with whole tailings and gravity flow was applied because the filling times line of5.24 could meet the requirement of gravity flow.Currently,first mining of No.310 room in ore block at this stage successfully achieved the recovery rate of 92.0% and the dilution rate of 9.6%,which were better than the technical indexes in-120 mstage mined by sublevel caving method.
关 键 词:阶段空场嗣后胶结充填法 自流输送 回采率 贫化率