分段凿岩阶段嗣后充填法在金山店铁矿的试验研究  被引量:5

Experimental Study on Stage Backfilling Method with Sublevel Drilling in Jinshandian Iron Mine

在线阅读下载全文

作  者:李铁一[1] 王洋[2,3] 王康[1] 宋卫东[2,3] 

机构地区:[1]武汉钢铁集团矿业有限责任公司,湖北武汉430080 [2]北京科技大学金属矿山高效开采与安全教育部重点实验室,北京100083 [3]北京科技大学土木与环境工程学院,北京100083

出  处:《矿业研究与开发》2015年第5期34-38,共5页Mining Research and Development

摘  要:简要介绍了金山店铁矿采用充填采矿法的紧迫性以及进行试验矿块作业的必要性。根据试验矿块的开采技术条件,结合矿山目前的具体情况,选择分段凿岩阶段嗣后充填采矿法,并对采准切割、回采等采矿工艺进行了设计。最后,结合试验采场现场作业中遇到的问题,提出补强锚索预控顶支护的建议,保障了下部采场的正常作业,解决了从崩落法向充填法的过渡问题。The urgency of using filling method and the necessity of test blocks operation in Jinshandian Iron Mine were briefly introduced.Based on the mining conditions of test blocks and combined with the specific situations of mine,stage backfilling method with sublevel drilling was selected.And the mining processes,such as mining preparation,cutting and stoping,were designed.Finally,according to the problems of field operation in test stopes,the beforehand control-roof supporting with reinforcing anchor was put forward,which guaranteed the normal operation of the lower stops,and solved the problems in the transition from caving method to filling method.

关 键 词:分段凿岩阶段嗣后充填采矿法 补强锚索 预控顶 

分 类 号:TD853.34[矿业工程—金属矿开采] TD861.1[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象