东秦岭特长隧道平行导坑快速施工组织管理与进度统计分析  被引量:2

Fast Construction Management and Progress Analysis of Parallel Drift of the Especially Long East-Qinling Tunnel

在线阅读下载全文

作  者:刘志春[1] 刘勇[1] 秦培文[2] 

机构地区:[1]石家庄铁道学院土木工程分院,河北石家庄050043 [2]中铁十八局集团有限公司,天津300022

出  处:《石家庄铁道学院学报》2004年第2期41-44,53,共5页Journal of Shijiazhuang Railway Institute

摘  要:东秦岭特长隧道平行导坑出口段作为正洞的辅助坑道,在施工中科学组织管理,优化工序组合,实现快速掘进,指导正洞施工。平行导坑最高月进尺406.8m,连续4个月进尺突破400m,月平均进尺为292.5m,创造了小断面人工钻爆平均月进尺全国最高纪录。Access section of the parallel drift in the especially long East-Qinling tunnel is the auxiliary galley of the main tunnel. During the construction, scientific management and optimized process combination is accomplished for fast tunneling, guiding the constriction of the main tunnel. The fastest monthly record of parallel drift excavation cycle length is 406.8 m with the excavation cycle length exceeding 400 m for four months on end, the average cycle length being 292.5 m, setting a new record in China.

关 键 词:特长隧道 平行导坑 快速施工 施工组织管理 

分 类 号:U455.2[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象