龙滩水电站地下厂房岩锚吊车梁设计  被引量:3

Design of Rock Bolted Crane Beam for the Underground Powerhouse of Longtan Hydropower Station

在线阅读下载全文

作  者:周帆[1] 杨伏秋[1] 张孝松[1] 

机构地区:[1]中南勘测设计研究院,湖南长沙410014

出  处:《红水河》2004年第2期110-113,共4页Hongshui River

摘  要:在大型地下洞室中采用岩锚吊车梁可以缩窄洞室跨度 ,有利于围岩稳定 ;及早形成运输能力 ,加快施工进度。论文对龙滩水电站地下厂房采用岩锚吊车梁的设计思路予以重点介绍 ,并从设计角度提出对施工技术、缺陷部位的处理。The use of rock bolted crane beam in large caverns can shorten the cavern span and improve the stability of surrounding rock masses, thus obtain an early access to transportation within the cavern and accelerate the construction progress. Emphasis is put on the introduction to the design principle of the rock bolted crane beam used in the underground powerhouse of Longtan project, and requirements are put forward on construction technique, treatment of defect parts, loading test and observation design in response for the design of the crane beam.

关 键 词:岩锚吊车梁 结构设计 龙滩水电站 

分 类 号:TU375.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象