检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省电大建筑工程系,210013 [2]连云港广播电视大学,222006 [3]南京市五环管桩公司,210013
出 处:《连云港职业技术学院学报》2004年第2期42-44,共3页Journal of Lianyungang Technical College
摘 要:预应力管桩基础工程设计质量监理应当重视设计阶段监理,强调设计与施工场地的具体情况相结合。管桩设计质量监理的六个主要环节,即:优化设计方案、确定单桩承载力、设计布桩、选择桩锤、确定"收锤标准"、根据工程地质条件选择合理的管桩施工方法。文章提出了管桩基础的应用范围,对预应力管桩基础的推广、设计和监理等工作都有较高的参考价值。In the work of pre-stressed concrete pipepile groundwork, the quality supervision centers on combination of design and physical circumstances on the construction site. Major six links in the quality supervision of pipepile design are optimization of design plan, definition of bearing capacity of pile, design of piles, choice of pile hammer, standard of stopping piling as well as choice of reasonable pipepile construction method according to the geologic setting of the work. The paper offers the application range of pipepile groundwork, which will be of great reference value for information to popularization, design and supervision of pre-stressed concrete pipepile groundwork
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40