检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电三局,西安710016 [2]中国水电西北勘测设计研究院,西安710065
出 处:《西北水电》2004年第2期23-27,31,共6页Northwest Hydropower
摘 要:水电站混凝土闸墩预应力锚索空间结构复杂,影响施工质量因素较多。根据小峡电站的设计特点,从施工的角度阐明了如何从控制埋管、材质及张拉设备检验标定、钢绞线理论伸长值计算、灌浆回填等方面来确保设计意图的有效贯彻,对施工效率和工程质量的提高积累了一定的经验。Hydropower station's concrete pier tendon has sophisticated spatial structure and the factors affecting construction quality are numerous. On the basis of design features of Xiaoxia hydropower station and from the view point of construction the article throws light on how to ensure effective execution of design intentions by controlling embedded pipes and material quality and in respects of calibration of stretching apparatus, calculation of strand theoretic elongation value and grouting backfill. Certain experience is obtained on enhancing construction efficiency and quality.
分 类 号:TV554.13[水利工程—水利水电工程] TV662.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117