检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:毛庆传[1]
机构地区:[1]上海电缆研究所,上海200093
出 处:《电力设备》2004年第6期1-8,共8页Electrical Equipment
摘 要:文章分析了三峡500kV输电工程建设对架空线缆的技术要求,总结了近年来我国线缆行业依托三峡输电工程建设大力开展技术创新工作所取得的令人瞩目的技术进步。三峡工程极大地促进了我国架空线缆制造业水平的提高,使我国架空线缆制造水平、产品质量和生产能力上了一个新台阶,包括钢芯铝绞践、铝合金线与铝包钢践及其大跨越导线、光纤复合架空地线(OPGW)和高强度与特高强度镀锌钢线等。This paper analyzes the technical requirements of overhead cable line for construction of Three Gorge 500 kV Power Transmission Project, summarizes the great technical advances in developing technical innovation vigorously in China's cable line industry, reiving on construction of Three Gorge Power Transmission Project. At the same time, the manufacturing level in China's cable line industry is improved, which makes the manufacturing level, product quality and productivity of overhead cable line going up to new step, including aluminum conductor steel reinforced, aluminum alloy conductor and aluminum covered steel wire and its long crossover wire, OPGW and high-strength and special high-strength galvanized steel wire.
分 类 号:TM726.3[电气工程—电力系统及自动化] TM726.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.238