检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《煤矿机电》2004年第4期26-29,共4页Colliery Mechanical & Electrical Technology
摘 要: 对高压同步电动机的断电失步及断电失步后电源重新恢复时非同期冲击的过渡过程进行了详细的分析,建立了非同期冲击时刻电动机的Park电压状态方程与机械运动方程,进而得出其较为准确的数学模型。并基于MATLAB对这种严重故障状态进行了仿真研究,利用四阶变步长龙格-库塔法得到了七阶变系数非线性微分方程组的数值解,给出了各电气与机械分量的波形。In this paper, the asynchronous impulsion transitional process of power-off step-out and power restoring after power-off step-out for high-voltage synchronous motor is analyzed in detail, and the PARK voltage state equations and mechanical movement equations of asynchronous impulsion process are established, then the comparably exact mathematic model is gained. In the same time, based on MATLAB and four-variational-step Runge-Kutta method is adopted for the simulated study of the serious fault state, thus the numeric solution of seven-step variation coefficient non-linear differential equations is concluded and the waveform of each electric and mechanical component is given.
关 键 词:高压同步电动机 断电失步 非同期冲击 过渡过程 仿真
分 类 号:TM341[电气工程—电机] TP391.9[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28