广州鹤洞大桥斜拉桥临时固结装置设计  被引量:1

Design of Temporary Consolidation Devices of Cable-Stayed Bridge of Guangzhou Hedong Bridge

在线阅读下载全文

作  者:宁平华[1] 张靖[1] 陈加树[1] 

机构地区:[1]广州市市政工程设计研究院,广东广州510060

出  处:《城市道桥与防洪》2004年第4期9-11,共3页Urban Roads Bridges & Flood Control

摘  要:本文以广州珠江鹤洞大桥主桥斜拉桥为工程背景 ,介绍斜拉桥等大跨度桥梁悬臂施工过程中临时固结装置的一般原理和方法 ,特别介绍鹤洞大桥主桥斜拉桥临时固结装置的新构思、新设计以及安装和拆除工艺等。Taking the main bridge ? cable-stayed bridge of Hedong Bridge over the Zhujiang River in Guangzhou City as the project background, the paper introduces the general principle and method of temporary consolidation devices during the cantilever construction of large-span bridges such as cable stayed bridge etc. it also especially introduces the new conception, new design, installation and removal process etc. of temporary consolidation devices of the main bridge ? cable-stayed bridge of Hedong Bridge.

关 键 词:广州鹤洞大桥 斜拉桥 临时固结装置 设计方法 悬臂施工 

分 类 号:U448.27[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象