对坝系工程可行性研究报告编制中几个问题的思考  被引量:1

Pondering over Issues on Working out a Feasibility Study Report of Dam System Project

在线阅读下载全文

作  者:王英顺[1] 曹丽玫[1] 马勇[2] 辛瑛[2] 

机构地区:[1]黄河上中游管理局规划设计研究院,陕西西安710021 [2]黄河水利委员会天水水土保持科学试验站,甘肃天水741000

出  处:《中国水土保持》2004年第9期11-12,39,共3页Soil and Water Conservation in China

摘  要:淤地坝在治理黄土高原水土流失、改善当地群众生产生活条件及生态环境建设中发挥了极其重要的作用。对不同侵蚀强度区骨干坝单坝控制面积指标、骨干坝的建坝顺序、骨干坝与中小型坝的配置、旧坝改建与加固中常见问题的处理原则进行了探讨。Warping dams have played extremely important functions in controlling soil and water loss of the Loess Plateau and improving the living and production conditions of the local people and ecological environment. The paper approaches control area indexes of a single key dam, construction sequence of key dams, configuration of key dams and medium and small-sized dams and handling principles of common issues in old dam rebuilding and strengthening for different erosion intensity regions.

关 键 词:骨干坝 坝系工程 可行性研究 黄土高原 

分 类 号:S157.2[农业科学—土壤学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象