三峡至广东500kV线路广东侧直流换流站外绝缘爬电比距参考盐密的确定  

Determination of specific creepage distance and equivalent salt deposit density of external insulation for Guangdong-side converter station of 500 kV DC line from the Three Gorges to Guangdong

在线阅读下载全文

作  者:张军[1] 何宏明[1] 王付鹏[1] 

机构地区:[1]广东省电力试验研究所,广东广州510600

出  处:《广东电力》2004年第3期17-20,共4页Guangdong Electric Power

摘  要:三峡至广东 50 0kV直流输电线路的设备外绝缘水平是工程建设的基本问题之一 ,因此对广东侧直流换流站站址所在区域的污秽状况进行了调查。通过分析该换流站站址区域的主要废气排放量、大气环境质量、气象状况和主要污染源的情况 ,确定了该换流站的交、直流污秽等级 。The equipment external insulation level of 500 kV DC transmission line from the Three Gorges to Guangdong is a basic consideration in the project, and an investigation was made into the pollution condition on the location for its Guangdong-side converter station. By analyzing the exhaust emissions, atmospheric and environmental quality, weather and major pollutant sources on the location, the AC/DC pollution grade of the converter station is determined along with corresponding specific creepage distance and equivalent salt deposit density (ESDD).

关 键 词:西电东送 直流换流站 外绝缘 污秽 参考盐密 

分 类 号:TM852[电气工程—高电压与绝缘技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象