检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:门汉光[1]
机构地区:[1]广州市设计院,广州市广卫路10号510030
出 处:《给水排水》1993年第7期30-33,49,共5页Water & Wastewater Engineering
摘 要:广州赛马场是我国第一个现代化的、符合国际标准的赛马场,整个工程分两期建设。本文介绍了第一期工程场地排水、跑道喷淋水、看台及马房建筑给排水等项目的设计与构思,以及在施工过程中作改进的实际情况等。Being the first modern horsecourse tallying with the international standards,the Guangzhou Turf is being constructed in two phases.The conception and design of the project including the water supply and drainage for the course,water spray for the track and water supply and drainage for the stand and stable building were respectively introduced in the paper, and the further improvement during construction was also described.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117