桩长、桩型及打桩的速率、顺序等因素对挤土的影响  被引量:11

The Effects of Pile Length,Pile Type,Pressing Rate & the Sequence of Pile-driving on Squeezing to Soil

在线阅读下载全文

作  者:王兴龙[1] 石春梅 

机构地区:[1]昆山市建设工程质量监督站,江苏昆山215300 [2]昆山水利建筑工程公司,江苏昆山215300

出  处:《土工基础》2004年第3期46-48,共3页Soil Engineering and Foundation

摘  要:预制桩打入时的挤土作用会使附近已打好的桩及原有建筑物或周围其他设施产生破坏。挤土程度的大小除了与桩的截面积及某处与桩间的距离有关外,还与桩长、桩型、打桩速率及打桩顺序有较大关系。本文即讨论上述因素对挤土影响的定量关系。The extrusion squeezing caused by the precast piles could damage the existed piles nearby and existed buildings or the other surrounding facilities. The land squeezing extent has much sonething to do with pile length,pile type the pressing speed & the sequence of the piling work as well as of the piles cross section and the distance from some particular points to the piles or between the piles. All thess factors are discussed in this article..

关 键 词:打桩 挤土 建筑物 土体变形 高层建筑 

分 类 号:TU473.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象