XXJ300/500液压蓄能修井机管柱起升仿真分析  被引量:5

Simulation Analysis on XXJ300/500 Hydraulic Energy-storing Workover Rig Lifting Tubingstring

在线阅读下载全文

作  者:张路军[1] 

机构地区:[1]烟台大学机电汽车工程学院,烟台264005

出  处:《机床与液压》2004年第8期76-78,共3页Machine Tool & Hydraulics

摘  要:在深入分析XXJ30 0 / 5 0 0液压蓄能修井机工作原理的基础上 ,建立了XXJ30 0 / 5 0 0液压蓄能修井机起升管柱时系统的数学模型。用Matlab对此数学模型进行了仿真分析 ,得出了管柱重量。Based on the analysis of the working theory of XXJ300/500 hydraulic energy-storing workover rig, the mathematic model of XXJ300/500 hydraulic energy-storing workover rig in lifting tubing string was established. The simulation analysis was performed on the mathematic model with Matlab, and the affecting law of tubingstring weight, the throttle valve path area and the nitrogen container volume to the tubingstring lifting velocity was obtained.

关 键 词:修井机 起升 数学模型 仿真 

分 类 号:TE835[石油与天然气工程—油气储运工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象