检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:欧文兵[1]
出 处:《水力发电》2004年第7期40-42,共3页Water Power
摘 要:西藏金河水电站根据地形特点采用跨流域引水发电模式。枢纽布置中考虑到引水防沙问题,采用“侧向取水、正向泄洪冲沙”及“表面排沙、中层取水、底层冲沙”的布置原则。首部枢纽组采用水库沉沙技术解决工程泥沙问题。为保证水库的泥沙库容,需进行不定期的冲沙及监测。According to the local topography characteristic of Jinhe hydropower s tation, the model of water transfer via inter-basin was adopted. In order to sol ve the problem of fetching water and the sand deposit,The principles of ″fetchi ng water lateral, flood discharging and sand sluicing from front″ and ″trashin g from Surface, fetching water at middle level, sand sluicing at bottom″ were i ntroduced. The technique of sand deposit in reservoir was adopted to solve the p roblem of sand in head building, it is necessary to aperiodic sluice sand and mo nitor to guarantee the storage for sand in reservoir.
关 键 词:枢纽布置 首部枢纽 引水隧洞 厂房 边坡处理 金河水电站
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28