向家坝水电站地下厂房变顶高尾水系统研究  被引量:10

Study on the tailrace system with the ceiling height changes of underground powerhouse of Xiangjiaba Hydroelectric Project

在线阅读下载全文

作  者:辜晓原[1] 李佛炎[1] 禹芝文[1] 

机构地区:[1]中南勘测设计研究院,湖南长沙410014

出  处:《水力发电》2004年第6期23-26,共4页Water Power

摘  要:为了满足电站的调节保证要求,减小地下洞室群的规模,向家坝水电站地下厂房采用了特殊的尾水系统布置方案,即变顶高尾水洞方案,取消了尾水调压室。在研究水电站变顶高尾水洞基本工作原理的基础上,提出了向家坝水电站右岸地下厂房变顶高尾水洞布置方案研究的基本思路和具体步骤,论证了采用变顶高尾水洞方案的可行性和合理性。In order to meet the regulation guarantee requirements, and to minimize the size of underground cavern complex, the special tailrace system scheme (i.e., a tailrace tunnel with ceiling height changes and a cancellation of tailrace surge chamber) has been adopted for the Xiangjiaba Hydroelectric Project. This paper presents the basic working principles and design philosophy of the special tailrace system, and justifies the availability and rationality of the scheme, based on the studies of basic working philosophy of a tailrace tunnel with ceiling height changes.

关 键 词:变顶高尾水洞 数值计算 模型试验 向家坝水电站 

分 类 号:TV134.3[水利工程—水力学及河流动力学] TV741

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象