龙滩水电站地下厂房洞室群围岩稳定性研究  被引量:5

Stability study of surrounding rockmass excavations for the underground powerhouse in Longtan Hydropower Station

在线阅读下载全文

作  者:赵海斌[1] 李学政[1] 张孝松[1] 

机构地区:[1]中南勘测设计研究院,湖南长沙410014

出  处:《水力发电》2004年第6期37-40,共4页Water Power

基  金:国家电力公司重大科技攻关项目(KJ00-03-23-03)部分内容

摘  要:龙滩水电站输水发电系统洞室群是结构复杂的巨型地下工程。洞室群围岩为陡倾角层状岩体,围岩的稳定性是工程建设的关键问题。针对围岩稳定性和支护处理,在工程勘测设计阶段先后进行了大量的分析研究工作,在工程施工初期又进行了科研攻关,为全面论证该巨型地下工程围岩稳定性提供了有力的技术保障。The excavation for water conveyance and electric power generation system is a gigantic underground works with complex structure in Longtan Hydropower Station. Surrounding rock of underground works is in steep dip and sill like, so that its stability is the key to the project during its construction period and in future. A large number of analytical investigation were carried out aiming at the stability of surrounding rock and its support during its exploration survey and design phase, and as well as scientific researches of tackling key problem were conducted at initial stage of construction. The results of these research efforts supply potent tech support for demonstrating the stability of surrounding rock to such as huge underground works.

关 键 词:地下厂房 围岩稳定性 工程地质分析 块体稳定分析 数值分析 稳定监测 龙滩水电站 

分 类 号:TU457[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象