检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水科学进展》2004年第4期454-457,共4页Advances in Water Science
基 金:国家自然科学基金资助项目(50379022;59979013)~~
摘 要:建立了二维非恒定渗流的有限元并行计算模型,在windows操作系统下实现了基于消息传递的二维渗流的有限元并行计算。模型采用广义极小残余算法(GMRES)对方程组进行并行迭代求解,通过分析数据执行时的相关性和检验算法结构的固有串行性,将原有串行算法中的算法元直接并行化。对溪洛渡上游围堰的渗流分析进行了并行数值模拟,并针对水位骤降情况下非恒定渗流进行了并行计算,证明了模型的合理性。对模型进行了加速比测定,可以看出并行计算的效率随着问题规模的增加而逐渐提高。The parallel groundwater model for 2D unsteady seepage flow with finite element method is established. The message passing interface is applied to simulate saturated-unsaturated seepage flow on Windows NT. To solve the elliptic differential equation, the implicit numerical scheme is applied and a parallel generalized minimal residual algorithm is used to solve the large sparse linear system. In order to improve the performance of the parallel program, multiple techniques are used, such as load balance, communication improvement and global operations. To verify the model, the seepage flows through the cofferdam of Xiluodu hydropower station and two kinds of unsteady seepage flows are simulated. The results obtained are reasonable. In the end, the speedup of the parallel computing model is evaluated. It can be seen that better parallel performance is achieved as the computational scale increases.
关 键 词:非恒定渗流 并行计算 广义极小残余算法 二维非恒定渗流 有限元
分 类 号:TV139.14[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15