检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:詹花茂[1] 李成榕[1] 陈秀娟[1] 李信[1]
出 处:《高电压技术》2004年第8期1-2,19,共3页High Voltage Engineering
摘 要:用ATP仿真研究了 110kV线路雷击响应的一些杆塔和线路模型 ,指出分段传输线模型是较合理的杆塔模型。仿真结果有助于制定用带串联间隙线路避雷器来降低线路雷击事故的相应措施。Metal oxide surge arresters are installed on transmission lines where tower grounding resistance is high and conventional means to lower tower grounding resistance are not practical. The paper investigates characteristics of some tower and transmission line models developed by the Alternative Transient Program (ATP) in order to simulate the lightning performance of a 110 kV transmission line. The results obtained from simulation can help to determine the countermeasure to reduce lightning faults in the transmission line by installing transmission line arresters with series air gap.
分 类 号:TM862[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117