500kV高姜段线路工程悬浮式抱杆选取方案  

Selection scheme of suspension boom in construction of 500 kV Gaojiang transmission line project

在线阅读下载全文

作  者:李海[1] 

机构地区:[1]安徽送变电工程公司,合肥市230601

出  处:《安徽电力》2004年第3期16-21,共6页Anhui Electric Power

摘  要:随着送电线路工程条件的不断变化,一些运输地形复杂、工具配备不宜过大的项目,为解决进度和经济性要求,采用比较特殊的施工方法,如在施工的立塔阶段,选取悬浮式抱杆进行塔材吊装工作。为满足安全性和适用性要求,需要计算受力情况选取抱杆参数,并用计算过程中反映的在不同使用状况下的受力情况,作为提出使用要求、指导施工过程的依据。As some transmission line projects limited by complicated construction terrain and the use of large equipment in construction,to meet the requirements of construction plan and economy, some special construction methods should be used. At the tower erection stage, the suspended boom is usually selected to lift tower elements. To be safe and applicable, the load stress should be calculated to select parameters of the boom, and different stressed situations at different circumstances calculated are used as bases and references in the construction process.

关 键 词:送电线路工程 悬浮式抱杆 铁塔结构 受力计算 

分 类 号:TM726[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象