检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨晋营[1]
机构地区:[1]水利部山西水利水电勘测设计研究院,山西太原030024
出 处:《水利与建筑工程学报》2004年第3期35-38,共4页Journal of Water Resources and Architectural Engineering
摘 要:沉沙池作为多沙河流引水枢纽的重要建筑物,其正常运行是发挥枢纽工程效益的重要条件。沉沙池设计应根据河流泥沙情况及枢纽运行条件,提出合理的运行设计和原型观测设计。运行设计应满足沉沙池运行水位、设计入池流量、含沙量、泥沙沉降设计标准和运用时间等运用条件。原型观测设计要有针对性,根据工程等级、规模、类型、布置、水沙条件等,确定相应原型观测内容和观测布置。The normal operation of desilting basin, being an important building in diversion pivot of the sediment-laden river, is an important condition of developing the engineering benefit of the pivot. For the design of desilting basin, the reasonable operation and prototype observation design should be offered according to the river sediment situation and pivot operation condition. The operation design must meet with its operation conditions of the operation level, design inflow discharge, sediment concentration, sediment settlement design standard and the operation time. The prototype observation of the desilting basin must be designed according to the conditions of the engineering degree, scale, type, layout and water-sand condition,etc.
分 类 号:TV673.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175