水力负荷周期对人工快渗系统污染物去除效果的影响  被引量:11

The Influence of Hydraulic Loading Cycle on the Removal Effect of Constructed Rapid Infiltration System

在线阅读下载全文

作  者:张永华[1] 张金炳[1] 殷淑华[1] 钟佐燊[1] 

机构地区:[1]华北水利水电学院,河南郑州450011

出  处:《华北水利水电学院学报》2004年第3期68-71,共4页North China Institute of Water Conservancy and Hydroelectric Power

基  金:国家重点基础研究发展规划项目(G1999045706);国家自然科学基金重点项目(49832005)

摘  要:以天然砂作为主要渗滤介质处理洗浴污水的试验研究的结果表明,在相同的水力负荷条件下,采取2种明显不同的水力负荷周期运行,人工快渗系统对洗浴污水的污染物去除效果具有明显的差别,通过缩短水力负荷周期,提高了人工快渗系统的复氧效率,增大了水在系统中的停留时间,快渗系统的污染物去除效果得到了明显改善.Two lab-scale Constructed Rapid Infiltration Systems (CRI) have been designed to treat bath wastewater by using natural sands for seven months. The results show that CRI have quite different removal effect by using two different Hydraulic Loading Cycle (HLC) at the same Hydraulic Loading (HL). By shortening HLC of the system, the oxygen recovery rate is increased, the Hydraulic Residence Time (HRT) is lengthened and the removal effect is improved apparently.

关 键 词:洗浴污水 天然砂 快速渗滤 水力负荷周期 

分 类 号:X52[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象