公伯峡水电站左岸溢洪道泄槽防空蚀设计优化  

Design optimization of cavitation control of the left chute of spillway of Gongboxia Hydropower Station

在线阅读下载全文

作  者:李贵信[1] 

机构地区:[1]黄河上游水电开发有限责任公司建设分公司,青海化隆810902

出  处:《水力发电》2004年第8期28-29,共2页Water Power

摘  要:为了提高公伯峡水电站左岸溢洪道泄槽抗空蚀设计的可靠性、安全余度和减少施工难度,在分析国内外高速水流泄洪建筑物运行实例的基础上,结合公伯峡工程实际,通过水力学模型实验验证,优化设计采用了增加掺气设施,保证高速水流底部充分掺气,从而防止了泄洪建筑物的空蚀破坏。这一措施不仅简单、易行,还可节约工程投资、增大工程安全度和可靠性。In order to enhance the credibility and safety degree of anti cavitation design and to reduce the difficulty of construction, on the basis of analyzing on the examples of high speed flow flood releasing structures at home and abroad, in combination with the actual conditions of Gongboxia hydropower project, we used the hydraulics model experiment and optimal design and adopted the aeration facilities to guarantee the full aeration in the bottom of high speed water flow so that it prevents from cavitation. Such measure is not only simple, easy to use but also can save the investment of project and increase the safety and reliability of the project.

关 键 词:空蚀控制 掺气设施 优化设计 溢洪道 公伯峡水电站 

分 类 号:TV131.32[水利工程—水力学及河流动力学] TV651.12

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象