沙牌碾压混凝土高拱坝施工技术与质量控制  被引量:1

Construction technology and quality control for Shapai RCC Arch Dam

在线阅读下载全文

作  者:朱素华 黄恩福 

机构地区:[1]中国水利水电第八工程局,湖南长沙410007

出  处:《水利水电技术》2004年第10期31-34,共4页Water Resources and Hydropower Engineering

摘  要: 沙牌大坝施工采用全断面通仓簿层连续上升施工工艺,在碾压混凝土施工过程中采取了真空溜管、诱导缝、有盖重与无盖重固结(接触)灌浆相结合、改性混凝土、高抗裂材料等施工工艺方法.完工后在坝体取出的碾压混凝土芯样最长达13 2m,芯样表面光滑,集料分布均匀,层间结合良好,施工质量优良.The application of thin-later full-section and full-surface area placement technology in Shapai RCC Dam is described in this article. During construction, vacuum chuting, induced joints, consolidation(contact) grouting with and without cover weight, improved concrete, high anti-cracking materials and other quality control methods were used. The RCC samples of 13.2 m length each, obtained after completion of the placement, have demonstrated smooth surface, well-distributed aggregate, good contact surfaces and high construction quality.

关 键 词:全断面碾压 施工技术 质量控制 沙牌碾压混凝土拱坝 

分 类 号:TV642.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象