检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孔德铭
出 处:《水力发电》2004年第9期10-12,共3页Water Power
摘 要:小浪底水电厂发电机灭磁系统选用ABB公司的快速磁场断路器FCK配合SiC非线性电阻灭磁形式。其灭磁能量计算以发电机额定运行工况下出口突然发生三相短路时励磁绕组所流过的最大电流为基础。小浪底电站6台机组已全部投入运行,灭磁和转子过电压保护均未出现过异常情况。The generator's de-excitation system for the Xiaolangdi Hydropower Station adopted the de-excitation mode of fast magnetic breaker FCK and non-linear sic resistance which are made by ABB. The de-excitation energy calculation is based on the maximum current of the excitation winding when the generator breaker broke out a 3-phase short circuit under the rated working conditions. All six generating units of Xiaolangdi Hydropower Station have been in operation, and the faults of the de-excitation system and the over-voltage protection of the rotor have not occurred.
关 键 词:设备选型 灭磁系统 发电机 非线性电阻 高速磁场断路器 小浪底水电厂
分 类 号:TM312[电气工程—电机] TV741[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28