二滩水轮发电机主要焊接部件制造工艺  

Manufacturing Procedure of Major Welding Parts of Hydrogenerators for Ertan Power Station

在线阅读下载全文

作  者:赵英海[1] 阎海滨[1] 

机构地区:[1]哈尔滨电机厂有限责任公司,黑龙江哈尔滨150040

出  处:《大电机技术》2004年第5期33-35,共3页Large Electric Machine and Hydraulic Turbine

摘  要:本文介绍了二滩机组的主要焊接部件定子机座和转子支架的制造工艺。机座采用大盒形筋结构 ,对于控制环板的平面度的效果比较明显 ,也增加了机座的刚度。转子支架的工地焊缝中立焊缝采用搭板连接的接头形式。中心体的立筋与支臂的立筋之间可以允许有较大的间隙 ,与传统的工艺相比 ,可以在中心体装焊后不再对立筋进行机加工 。This paper describes technology process of stator frame and rotor spider for Ertan power station. The selection of box type rib structure allows effective controlling of the platness of ring plate and increasing of the frame stiffness. Stiffener connection is used as the joint form for the vertical position welds in site wedling of rotor spider.Relatively large gap is allowed between the hub rib and the arm rib Compared with traditional technology process,machining cost is low,because it's not necessary to ma chine the rib after the assembly of the hub.

关 键 词:转子支架 水轮发电机 定子机座 部件 中心体 机组 控制环 焊接 立焊 加工成本 

分 类 号:TM312[电气工程—电机] TM311

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象