10MW高温气冷实验堆吸收球停堆系统设备热态试验  被引量:1

Thermal equipment test of absorption sphere shutdown system of 10 MW high-temperature gas-cooled reactor

在线阅读下载全文

作  者:黄志勇[1] 刁兴中[1] 周惠忠[1] 

机构地区:[1]清华大学核能技术设计研究院,北京102201

出  处:《核科学与工程》2004年第3期230-234,共5页Nuclear Science and Engineering

摘  要:碳化硼吸收球停堆系统是 10MW高温气冷实验堆的第二停堆系统 ,其功能是 ,在控制棒失效时 ,吸收球落入反射层的吸收球孔道 ,以达到紧急停堆的目的。介绍了在堆外、空气介质、150℃工作温度条件下 ,对吸收球传动机构设备进行的热态考验、传动试验和落球试验。结果表明 ,吸收球停堆系统 7套设备均达到了传动机构工作正常、落球时间在 3min之内、球位指示正确等设计要求。 7套设备安装到 10MW高温气冷实验堆上之后 ,在堆上进行了氦气介质下的热态落球试验 ,其结果达到设计规范的要求。The boron-carbon neutron absorption sphere s hutdown system is the second shutdown system of the 10 MW high-temperature gas -cooled reactor. This second shutdown system is designed for emergent shutdown by spheres falling down into the reflector when the control rods are in failure. The seven sets equipment of the second shutdown system were checked in thermal air condition of working temperature 150 ℃ over 2 hours, its mechanical drivin g and spheres falling properties were also tested. The thermal test data indicat e that the seven sets equipment of the second shutdown system have good mechanic al drive, acceptable sphere falling time of less than 3 minutes and proper ball level indication. After the second shutdown system installed into the nuclear re actor, the properties of the absorption spheres falling time were further tested in thermal helium gas, and the results showed that the second shutdown system a chieved its design goals.

关 键 词:10MW高温气冷实验堆 停堆 控制棒 氦气 反射层 碳化硼 空气介质 工作温度 传动机构 设备安装 

分 类 号:TL353.12[核科学技术—核技术及应用] TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象