检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖化文[1]
出 处:《人民长江》2004年第11期27-29,共3页Yangtze River
摘 要:在混凝土面板堆石坝中,趾板是大坝表面防渗体系与地基防渗体系的连接构件,其主要作用是防渗。趾板既是基础灌浆的工作平台,也是周边缝的依托,因此其作用是很特殊的。趾板的特殊地位决定了趾板的设计涉及的因素很多,采用不同的设计方法对这些因素的考虑是不同的。结合典型的具体工程实例,对目前采用的趾板设计的方法、趾板设计中应考虑的相关因素进行了较详细的讨论。认为:以"Y"线作为趾板结构控制线,概念明确,应用方便,且可采用便于施工的平趾板型式;采用"4+X"的趾板设计思想,趾板的设计和基础开挖灵活经济,因此更为科学合理。For concrete-faced rockfill dam, toe slab is the connecting element between seepage prevention system of dam surface and seepage prevention system of foundation, and mainly functions as seepage prevention. Toe slab is the work platform for foundation grouting and the support of peripheral joint and so it possesses special functions. The special role of toe slab determines that its design involves various factors and different design methods involve different considerations on these factors. In combination of typical project case, the detail discussion on correlative factors in toe slab design and design method are carried out. It is considered that taking “Y” line as the control line of toe slab structure characterizes clear concept, easy application and the plate-type toe slab which is convenient for construction can be adopted. The “4+X” toe slab design concept makes toe slab design and foundation excavation easy and economy, so, it is more scientific and reasonable.
分 类 号:TV640.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.123