检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工业建筑》2004年第9期19-21,80,共4页Industrial Construction
摘 要:由于基坑工程的复杂性 ,很难从理论上对围护结构水平位移和周围地表沉降进行预测 ,故在基坑开挖过程中信息化施工就显得特别重要。采用改进的BP算法对深基坑围护结构变形进行预测的方法 ,与传统的BP算法相比 ,该算法具有更快的收敛速度 ,能有效地改善传统BP算法收敛慢的缺点。通过对预测结果与实测结果进行对比分析 ,表明改进的BP网络是预测基坑围护结构变形的一种十分有效的方法。最后分析了基坑周围地表沉降与围护结构变形之间的关系。Because of the complexity of excavation engineering,it is very difficult to predict the displacement of retaining structure and the settlement of ground surface,and information construction is very important for an excavation engineering.A method for predicting displacement of retaining structure based on modified BP algorithm is used.The modified algorithm has higher convergence rate and thus improves the conventional one effectively.It is proved that prediction results agree with the measured ones very well,so displacement prediction by the modified BP algorithm is practicable.Finally,the relation between the displacement of retaining structure and the settlement of ground surface is analyzed.
关 键 词:基坑围护结构 深基坑 基坑变形 实测结果 基坑工程 基坑开挖 地表沉降 信息化施工 水平位移 改善
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145