给水加氧处理法在200MW调峰机组上的应用研究  被引量:3

Application of combined water treatment in 200 MW cycling unit

在线阅读下载全文

作  者:李永生[1] 张好峰[1] 郝晋堂 张雷[2] 

机构地区:[1]东北电力学院应用化学系,吉林吉林132012 [2]山西电力科学研究院,山西太原030001

出  处:《华东电力》2004年第9期23-27,共5页East China Electric Power

摘  要:介绍了将给水加氧处理法(CWT)用于200MW直流炉调峰机组的给水处理中所取得的经验和成果。通过给水处理条件优选试验,确定了适合该机组的水质控制参数,解决了该机组的给水在全挥发处理(AVT)时存在的铁溶出率高等诸多问题。同时对CWT和AVT给水处理条件下的水冷壁管等进行割管和X 射线衍射分析以及扫描电镜分析,验证了采用CWT后的实际效果。The experience and achievement of applying combined water treatment (CWT) in the feedwater treatment of 200 MW cycling unit with once-through boiler were introduced. Through the test for optimal selection of feedwater treatment conditions, the water quality control parameters suitable for the unit were determined and the problem of high iron content in feedwater during all volatile treatment (AVT) of feedwater was resolved. Through the comparison of X-ray diffraction analysis and SEM analysis of the water wall pipes samples under both CWT and AVT, the actual effect of CWT was proved.

关 键 词:给水加氧处理 直流锅炉 给水处理 调峰机组 

分 类 号:TM621.8[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象