检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘敬东[1] 韩福坤[1] 李运平[1] 杨小煜[2]
机构地区:[1]华北电力调度局,北京100053 [2]中国电力科学研究院,北京100085
出 处:《电力自动化设备》2004年第11期87-89,共3页Electric Power Automation Equipment
摘 要:华北电网先后与东北电网和华中电网实现联网。为适应电网调度体制改革和大区电网联网后的频率与联络线潮流控制。对自动发电控制AGC(Automatic Generation Control)软件功能如何能够进行多区域控制进行了研究,介绍了多区域三种控制模式、控制性能标准控制策略、电网稳定控制策略。同时利用电网能量管理系统应用软件优化AGC,进一步在华北电网实现在线经济调度。North China Power Grid has been connected with Northeast China Power Grid and Center China Power Grid. To adapt to the transformation of power grid dispatch and the frequency and tie-line power control after interconnection of power grid,a study of AGC(Automatic Generation Control) software for multi-area control is carried out. Three multi-area control modes are introduced, as well as the GPS (Control Performance Standard) control scheme and steady control scheme. For implementation of on-line economic dispatch in North China Power Grid,AGC will be optimized using EMS (Energy Management System) application software.
关 键 词:华北电网 自动发电控制 经济调度 潮流控制 联络线 电网稳定 电网调度 电网能量管理系统 体制改革 电网联网
分 类 号:TM734[电气工程—电力系统及自动化] F426.61[经济管理—产业经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28