预应力超静定结构的平衡荷载计算  被引量:5

Calculation of Balanced Loads in Statically Indeterminate Prestressed Concrete Structures

在线阅读下载全文

作  者:陈永春[1] 单荣民 焦彬如[2] 

机构地区:[1]中国建筑科学研究院 [2]浙江大学

出  处:《建筑结构学报》1993年第6期2-10,共9页Journal of Building Structures

摘  要:本文根据砼结构设计规范的抗裂验算规定,提出了计算预应力超静定结构平衡荷载的办法,并据此平衡荷载计算所需预应力钢筋的面积,避免了预应力超静定结构设计中按经验估算平衡荷载值引起的返工重算或不合理配筋。文中附有计算实例。Based on the stipulation of check computation of cracking resistance provided in the code for design of concrete structures in China,this paper presents a method for calculating the balanced loads in statically indeterminate prestressed concrete structures. The a-mount of prestressed reinforcement can be determined by these balanced loads.The proposed method can avoid the tedious recalculations or irrational prestressing caused by experimential estimation of the balanced loads in design.Numerical examples are given at the end of the paper.

关 键 词:超静定结构 预应力 平衡载荷 

分 类 号:TU322.02[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象