三峡左岸电站ALSTOM集团水轮发电机设计制造结构和安装特点简介  被引量:4

Brief Introduction to the Design and Installation of Hydrogenerators Produced by ALSTOM Group for the Three Gorges Left Bank Power Station

在线阅读下载全文

作  者:张连彬[1] 杨玺印[1] 

机构地区:[1]哈尔滨电机厂有限责任公司,黑龙江哈尔滨150040

出  处:《大电机技术》2004年第6期35-38,共4页Large Electric Machine and Hydraulic Turbine

摘  要:本文介绍了ALSTOM集团的水轮发电机的结构设计和安装特点。定子机座采用斜立筋结构 ,转子支架、上机架、下机架采用斜支臂结构。此结构不影响机组的轴向刚度 ,但增大了径向柔度。推力轴承采用自身泵外循环冷却系统。通过薄瓦和托瓦之间小钢柱在瓦面上分布位置差异及小钢柱直径差异来保证推力轴承安全稳定运行。This paper introduces the features of structural design and installation of the hydrogenerators produced by ALSTOM group. Stator frame uses skew rib.Rotor spider, upper and lower brackets use skew arm. This structure has no influence to the unit axial stiffness, but increases the radial flexility. Thrust bearing adopts self pump outer circulation cooling system. Bearing safe operation is ensured by different location of little steel pillars between the thin segment and supporting segment, and the different diameters of the steel pillars.

关 键 词:水轮发电机 结构设计 制造 推力轴承 自身泵外循环冷却系统 安装 三峡左岸电站ALSTOM集团 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象