检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东师范大学环境科学系,上海副教授200062
出 处:《城市轨道交通研究》2004年第5期70-73,共4页Urban Mass Transit
基 金:国家自然科学基金项目 ( 4 0 2 0 10 47);教育部人文社会科学研究项目 ( 0 1JC63 0 0 0 6)
摘 要:景观影响后评价是重大工程项目环境影响后评价的重要内容。采用公众问卷调查和照片评分方法针对高架轨道交通 3号线开展了景观影响后评价。评价结果表明 ,相对于原铁路 ,3号线的建设改善了沿线城市景观 ,其视觉效果随观察点距离的增加、高度的上升而提升。两侧绿化和周边旧城改造是Landscape impact post-evaluation is one of the important subjects of environmental impact post-evaluation for large projects.The existing landscape impact of rail transit Line 3 in Shanghai has been evaluated by using questionnaire and photo grading methods. The results of post-evaluation show that rail transit Line 3 has contributed to improve the landscape of Shanghai much more than the former railway line.This paper holds that more trees and shrubs and the reconstruction of old buildings along Line 3 are effective ways to improve the overall landscape of urban rail transit lines.
关 键 词:后评价 重大工程项目 上海 景观 增加 高架轨道交通 影响 铁路 改善 绿化
分 类 号:U239.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222