检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢巍[1] 刘东常[1] 杨开云[1] 张多新[1] 马文亮[1]
机构地区:[1]华北水利水电学院土木工程系,河南郑州450011
出 处:《水利水电技术》2004年第11期36-38,共3页Water Resources and Hydropower Engineering
摘 要: 对鸭池河水电站引水系统坝后背管进行了三维有限元分析,得出了背管在死水位、正常蓄水位、校核洪水位及温变作用等工况下产生的应力及位移,为该钢管设计及施工提供了依据.根据分析计算结果,提出了取消伸缩节的建议,可大量节省投资成本.In this paper, 3-D FEM(Finite Element Method) is adopted to analyze the stress and displacement of the penstock on downstream dam surface in the Yachihe Hydropower Station when the station is in operating conditions of dead water level, normal water level, and maximum flood level at different temperature conditions. The results obtained in the analysis form basis for the penstock design. Based on the analysis, the expansion joint of the penstock is suggested to be eliminated to reduce the cost of the penstock.
分 类 号:TV732.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.70.182