检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王宏斌[1]
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2004年第4期1-3,共3页Design of Water Resources & Hydroelectric Engineering
摘 要:沙坡头水利枢纽工程是以灌溉、发电为主 ,兼有生态用水的骨干水利工程 ,也是国家西部开发重点工程之一。重点介绍了枢纽布置、结构措施、工程措施、坝基防渗处理、观测设计、施工总布置和科学试验与研究等各项优化设计。工程设计和优化对工程质量、投资和施工工期控制等均起到了很大作用。Shapotou Water Control Project is the key water project with the main purpose for irrigation and power generation in association with ecological water supply. It is one of the most important projects in Western Development in Chin a. In this article, the optimized design on arrangement of control project, stru ctural measures, engineering measures, the foundation seepage treatment, monitor ing design, general arrangement for construction, scientific experiment and research, etc. are introduced. The optimization on engineering design has played a very important role on such factors as the project quality, investment and co ntrol of the construction period.
关 键 词:枢纽布置 观测设计 沙坡头水利枢纽工程 黄河沙坡头 坝基防渗 水利工程 生态用水 水利枢纽建设 重点工程 投资
分 类 号:TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15