三峡二期围堰垂直防渗墙的应变形态  被引量:8

Strain Status of Vertical Impervious Wall in TGP Stage-2 upstream Cofferdam

在线阅读下载全文

作  者:程展林[1] 

机构地区:[1]长江科学院,湖北武汉430010

出  处:《长江科学院院报》2004年第6期34-37,共4页Journal of Changjiang River Scientific Research Institute

摘  要:三峡二期围堰混凝土防渗墙的应力应变分析涉及到数值分析的接触算法,其难度不仅在于接触算法本身,而且在于土与结构的接触本构规律。以三峡二期围堰监测资料为依据,介绍了围堰防渗墙的应变、变形过程及规律,在假定防渗墙为弯压结构的前提下,给出了防渗墙应变与变形的关系,从而比较全面真实地给出了墙体典型断面的应变形态。该成果对于正确理解结构与土相互作用机理、分析数值分析接触算法的合理性具有参考意义。Structural numerical analysis for TGP Stages-2 upstream Cofferdam is a typical interaction problem of concrete structure and soil. The mathematical procedure on contact of numerical analysis used to analyze the stress and strain of concrete impervious wall, is involved. Its difficulty not only lies in procedure on contact itself, but also in contact constitutive regulation. In this paper, the process and rule of strain and deformation of impervious wall are presented based on monitoring data of the second stage cofferdam of the Three Gorges Project. The relation of strain and deformation is given on the assumption that impervious wall is a pressed-bending structure, which reflects strain state of typical impervious wall section veritably. This result is refered for correctly comprehending the interaction mechanism of concrete structure-soil as well as analyzing the rationality of the mathematical procedure on contact.

关 键 词:三峡工程 围堰 防渗墙 应变 监测 

分 类 号:TV551[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象