开都河察汗乌苏水电站覆盖层上趾板结构设计  被引量:2

The structural design of plinth slab on the overburdenfor Chakanwusu Project on the Kaidu River

在线阅读下载全文

作  者:王伟[1] 张发中[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065

出  处:《西北水电》2004年第4期11-14,共4页Northwest Hydropower

摘  要:开都河察汗乌苏混凝土面板砂砾石坝建在覆盖层上,坝高110 m,坝基砂砾石覆盖层最大厚度为46.7m, 在河床覆盖层处设置一道混凝土防渗墙防渗。文章对已建类似工程覆盖层地基的趾板结构型式进行了分类分析, 并对察汗乌苏水电站覆盖层上的不同趾板结构进行了应力应变分析比较,提出了合理可行的方案。The Chahanwusu concrete face rockfill dam will be built on the sandy gravel overburden on the Kaidu river, with a dam height of 110m and a maximum depth of sandy gravel overburden of 46. 7m. A concrete cutoff wall will be constructed at the overburden of the riverbed. The analysis is made of the structural type of plinth slab on the overburden for the completed hydropower stations, and the stress strain analyses and comparisons have been carried out on different plinth structure on the overburden for Chahanwusu Project, thus the reasonable and feasible scheme is put forward.

关 键 词:察汗乌苏水电站 覆盖层 趾板结构 连接板 防渗墙 

分 类 号:TV641.43[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象