玲珑金矿东山塌陷区的锚注联合治理  

The Combination Harnessing of Anchoring and Grouting to The Subsidence Area of East Mountain of Linglong Gold Mine

在线阅读下载全文

作  者:王培月[1] 王谦源[2] 

机构地区:[1]北京科技大学,北京100083 [2]青岛理工大学数理系,山东青岛266033

出  处:《黄金科学技术》2004年第6期27-30,共4页Gold Science and Technology

摘  要:对于覆盖碎石性杂填土的采空区地表塌陷问题,在地质雷达探测研究的基础上,文章提出了以锚固为主的锚注联合治理方法,解决了在碎石性杂填土中依靠简单的设备工艺打孔、护孔、注浆、穿锚等技术难题,对于急倾斜中厚以下矿体采空区冒落引起的地表塌陷治理具有重要意义。For the surface subsidence problem of the mined-out area covered with crushed rocks bankette, based on the exploration and research of geologic radar, this paper put forward the combination harnessing method of anchoring and grouting in which the anchoring is primary. This method resolved technology problems, such as boring, protecting hole, grouting and anchoring in the crushed rocks bankette by simple equipment and technology. It also has important significance to the harnessing of surface subsidence caused by the mined-out area falling of heavy-inclined and deep ore body.

关 键 词:地表塌陷 空区冒落 锚注治理 

分 类 号:TD327[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象