西气东输工程水土保持方案实施情况评价  被引量:5

Evaluation on Implementation of Soil and Water Conservation Planning of Project of West Gas Supplying to East

在线阅读下载全文

作  者:黄成志[1] 张来章[2] 蔡小春[1] 安乐平[1] 王宏[1] 

机构地区:[1]黄委会天水水土保持科学试验站,甘肃天水741000 [2]黄委会黄河上中游管理局,陕西西安710043

出  处:《水土保持通报》2004年第6期31-33,共3页Bulletin of Soil and Water Conservation

摘  要:依据西气东输工程水土保持方案采取实地调研和现场勘察相结合的方法,对水土保持预防保护、工程生物防治、土地整治措施的实施以及水土保持资金落实和监理、监测工作情况进行了综合评价。针对存在的水土保持工程质量不高,且与主体工程相比较严重滞后等问题提出了建设性意见。对促进保护环境以及水土保持"三同时"制度的落实具有重要作用。By means of field investigation and research in combination with spot reconnaissance, according to the plan of soil and water conservation of the West Gas Supplying to East Project, the paper has comprehensively evaluated the soil and water conservation precaution and protection, the engineering and vegetative control measures, the land reclamation measures, the implementation of soil and water conservation investment funds, and the supervising and monitoring of soil and water loss. Some proposals concerning problems of soil and water conservation measures lower quality and lagging behind the principal part of project are put forword. It is very important to enhance environment protection and carry out the soil and water conservation system of simultaneously designing and constructing and put it into operation.

关 键 词:西气东输工程 实施情况 土地整治 资金 “三同时”制度 落实 意见 水土保持方案 水土保持工程 预防保护 

分 类 号:S157[农业科学—土壤学] F426.22[农业科学—农业基础科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象